本文針對深開挖工程減少壁體變位即可降低鄰房沈陷之理念,探討以土質改良或土質加勁等方法減少開挖變位、設計及施工要點,最後以若干案例證明各種方法應用之效果。
英文摘要
This paper presents the uses of ground improvement methods in deep excavation site for the sake of building protection. Three methods are introduced; they are: deep mixing piles(DMP), jet grout piles(JGP)and micropiles. DMP and JGP are normally used to improve the soil within the excavation site. Micropiles, however, are used to reinforce the soil behind a diaphragm wall, or next to a building foundation. Design and construction of these methods are described in detail. Case histories from ten sites are presented to show the effectiveness of ground improvement. Generally, with the application of ground improvement in a deep excavation site, wall movement can be reduced to a few centimeters, as such, settlement of adjacent building can be minimized to less than 1-2 cm, which is normally within tolerable limit.